Tasmanian Archives & Heritage Office Project

TAHO is located on Hobart’s eastern shore.

Masters Contracting were approached to work with the Main Contractor to install many and varied HVAC systems, the project was completed in 2020 and consisted of:

  • Strict temperature and humidity control from ten fan coil units to provide heating, cooling and humidity control to almost 3000m2 of compactus area floor space
  • Air Conditioning systems to laboratory, quarantine, cold vault and other general areas
  • 150 metres of fabric ducting to provide conditioned air to compactus floor space
  • Refrigerated Rooms
  • Seven dehumidifiers and two humidifiers to satisfy humidity demand
  • Three air cooled chillers to provide glycol dosed chilled water to fan coil units
  • Two heat pump/chillers
  • Five general exhaust systems
  • Two dedicated outdoor air systems outdoor air
  • One Dynaflow fume cupboard to the laboratory