Oakdale Industries Project

This large workshop facility is located on Hobart’s Eastern Shore.

Masters Contracting were approached to work with the Project Managers to install the complex saw dust extraction system and was successfully completed in 2019.

The HVAC consisted of:

  • 250 metres of sawdust extraction ductwork ranging in size from 150mm to 600mm dia.
  • Installation of a 7.6 metre high sawdust collection unit
  • Integration of the saw dust collector to the existing high capacity dust collection unit
  • Installation of compressed air to the dust collections unit shaker system
  • Modification of ductwork to suit new pelletising machines

Project includes: